    Quantity Surveying Building Estimation With Cad And Excel (updated 11/2021)

    Posted By: ELK1nG
    Quantity Surveying Building Estimation With Cad And Excel (updated 11/2021)

    Quantity Surveying Building Estimation With Cad And Excel (updated 11/2021)
    MP4 | Video: h264, 1280x720 | Audio: AAC, 44.1 KHz
    Language: English | Size: 18.7 GB | Duration: 39h 57m

    Quantity Surveying,Quantity Takeoff,Steel Estimation,Rate Analysis,B.O.Q,Payments To Contractor,Interim Payment In Excel

    What you'll learn
    Estimation Of Complete Project Through Auto-cad And Excel
    Estimation Of Complete Project Through PDF Files/Hard Copy
    Beginner Training For Plan Swift
    Estimation Of Complete Project Through Plan Swift Software
    Bar bending Schedule Of Foundation,Columns,Beams,Slab,Stairs, In Excel
    How to Find Material Like Cement,Sand,Coarse Aggregates,Bricks
    Complete Material Statement In Excel
    Rate Analysis For Different Works Like ,Excavation, P.C.C, R.C.C, Masonry, Tiles, Plaster, Paint In Excel
    Will Learn How to Create B.O.Q Of Project
    Mode Of Payments To Contractor
    Interim Payment In Excel
    Microsoft Excel For Beginners
    Primavera P6 Training For Beginners
    Auto-cad 2020 For Beginners
    MS Project Training For Beginners
    Activities And W.B.S List In MS Excel
    Adding Manpower In Excel (Labor, Mason, Carpenter etc.)
    Finding The Duration Of Activities Based On Productivity
    Complete Project In Primavera p6 (Activities ,W.B.S, Relationship, Creating And Assigning Resources And Much More
    Complete Project In MS PROJECT (Activities ,W.B.S, Relationship, Creating And Assigning Resources And Much More

    Requirements
    • To have the Auto Cad And M.S Excel installed in your computer.
    • To have the minimum understanding for Civil Quantity/Estimation
    • To have a minimum understanding of construction processes.
    Description
    Complete Updated Course Last Update 09/2021

    Complete Package.

    Complete Project Estimation Through AutoCAD And Excel.

    Complete Project Estimation (Manual Calculations PDF Drawings Same Project.)

    Complete Project Estimation (Through Plan Swift Software Same Project)

    Primavera P6 Training For Beginners.

    We Will Create Complete Project In Primavera P6 (Same Project For Which We did Estimation)

    MS Project 2019 Training For Beginners

    We Will Create Complete Project In MS PROJECT (Same Project For Which We did Estimation)

    Excel Training For Beginners.

    Autocad Training For Beginners.

    Welcome to Quantity Surveying /Building Estimation online training course. it is focused on practical application of Estimation using Auto Cad & M.S Excel

    This course is a field oriented course and contains real examples and a full fledge real project for better understanding

    After successful completion of this course, you will be able to Estimate Any Building Project (From Foundation To Finishing)

    Major Topics That We Will Learn In This Course:

    Quantity Of Substructure (Isolated Footing) Through AutoCAD

    Excavation Quantity

    Formwork Calculations

    Concrete Quantity

    Quantity Of Sloped Footing Through AutoCAD

    Excavation Quantity

    Formwork Calculations

    Concrete Quantity

    Quantity Of Raft Foundation Through AutoCAD

    Excavation Quantity

    Formwork Calculations

    Concrete Quantity

    Quantity Of Different Items In Superstructure Through AutoCAD

    Column In S.S (Formwork, Concrete)

    Grade Beams (Formwork ,Concrete )

    Slab On Grade (Formwork , Concrete)

    Lintel And Top Beam (Formwork , Concrete)

    Slab (Concrete And Formwork)

    Brick Works

    Plaster Works

    Tile And Marble Works

    Paint Works

    Quantity Of Substructure (Isolated Footing) Manual Calculations PDF File Or Hard Copy Of Drawings

    Excavation Quantity

    Formwork Calculations

    Concrete Quantity

    Quantity Of Different Items In Superstructure Through PDF File, Manual Calculations

    Column In S.S (Formwork ,Concrete)

    Grade Beams (Formwork ,Concrete )

    Slab On Grade (Formwork , Concrete)

    Lintel And Top Beam (Formwork , Concrete)

    Slab (Concrete And Formwork)

    Brick Works

    Plaster Works

    Tile And Marble Works

    Paint Works

    Quantity Of Substructure (Through Planswift)

    Excavation Quantity

    Formwork Calculations

    Concrete Quantity

    Quantity Of Different Items In Superstructure (Through Planswift)

    Column In S.S (Formwork, Concrete)

    Grade Beams (Formwork, Concrete )

    Slab On Grade (Formwork, Concrete)

    Lintel And Top Beam (Formwork, Concrete)

    Slab (Concrete And Formwork)

    Brick Works

    Plaster Works

    Tile And Marble Works

    Paint Works

    Bar bending Schedule:

    Bar-bending Schedule Of Isolated Footing

    Bar-Bending Schedule Of Raft Foundation

    Bar-bending Schedule Of Column Necks And Columns

    Bar-bending Schedule Of Beams

    Bar-bending Schedule Of Stairs

    Bar Bending Schedule Of Slab

    Bar-Bending Schedule Of Two Way Slab

    Rate Analysis Of Different Works:

    Rate Analysis For Excavation

    Rate Analysis For Plain Cement Concrete (P.C.C)

    Rate Analysis For Reinforcement Concrete (Column Beam And Slab)

    Rate Analysis For Masonry Work

    Rate Analysis For Plaster Work

    Rate Analysis For Tile Work

    Rate Analysis For Paint Work

    Material Statement :

    Material Statement In Excel

    Bill Of Quantity (B.O.Q)

    Bill Of Quantity For A Project According To CSI Codes

    Mode Of Payments To Contractor

    Interim Payment

    Advance Payment

    Secured Advance

    Petty Advance

    Mobilization Advance

    Procedure To Create Interim Payment In Excel From Scratch.

    Primavera P6 Training For Beginners

    As We are Doing Same Project In Primavera So This Training Is For Those Who Are Beginners In Planning OR In Primavera.

    Complete Project In Primavera P6 With The Help Of MS Excel.

    Creating Activity List In Ms Excel.

    Add Manpower And Their Productivity In MS Excel

    Adding Duration To Activities Based On Productivity

    Creating Project In Primavera P6

    Importing All Of Activities From Excel To P6

    W.B.S And Relationship For Activities

    Creating And Assigning Resources To Activities (Work And Material Resources)

    Update The Project According To Actual (Time And Cost)

    MS PROJECT Training For Beginners

    As We are Doing Same Project In MS Project So This Training Is For Those Who Are Beginners In Planning OR In MS Project.

    Complete Project In MS Project With The Help Of MS Excel.

    Creating Activity List In Ms Excel.

    Add Manpower And Their Productivity In MS Excel

    Adding Duration To Activities Based On Productivity

    Creating Project In MS Project

    Importing All Of Activities From Excel To MS Project

    W.B.S And Relationship For Activities

    Creating And Assigning Resources To Activities (Work And Material Resources)

    Update The Project According To Actual (Time And Cost)

    Excel Training For Beginners

    As Excel Is Important For This Course So I Have Add Basic Training And Formulas For Those Who Are Beginners In Excel

    Auto-cad Training

    As Auto-cad Is Also Essential For This Course So I Have Also Included Auto-cad Training For Those Who Are Beginner In Auto-cad

    Who this course is for:
    • Site Engineers
    • Civil Engineers
    • Fresh Engineers.
    • Quantity Surveyors
    • Those who wants to pursue a career as a Quantity Surveyor/ Estimator
    • Civil Engineering Students