Tags
Language
Tags
July 2025
Su Mo Tu We Th Fr Sa
29 30 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31 1 2
    Attention❗ To save your time, in order to download anything on this site, you must be registered 👉 HERE. If you do not have a registration yet, it is better to do it right away. ✌

    https://sophisticatedspectra.com/article/drosia-serenity-a-modern-oasis-in-the-heart-of-larnaca.2521391.html

    DROSIA SERENITY
    A Premium Residential Project in the Heart of Drosia, Larnaca

    ONLY TWO FLATS REMAIN!

    Modern and impressive architectural design with high-quality finishes Spacious 2-bedroom apartments with two verandas and smart layouts Penthouse units with private rooftop gardens of up to 63 m² Private covered parking for each apartment Exceptionally quiet location just 5–8 minutes from the marina, Finikoudes Beach, Metropolis Mall, and city center Quick access to all major routes and the highway Boutique-style building with only 8 apartments High-spec technical features including A/C provisions, solar water heater, and photovoltaic system setup.
    Drosia Serenity is not only an architectural gem but also a highly attractive investment opportunity. Located in the desirable residential area of Drosia, Larnaca, this modern development offers 5–7% annual rental yield, making it an ideal choice for investors seeking stable and lucrative returns in Cyprus' dynamic real estate market. Feel free to check the location on Google Maps.
    Whether for living or investment, this is a rare opportunity in a strategic and desirable location.

    Capital Cost Estimation For Brownfield Chemical Projects

    Posted By: ELK1nG
    Capital Cost Estimation For Brownfield Chemical Projects

    Capital Cost Estimation For Brownfield Chemical Projects
    Last updated 9/2022
    MP4 | Video: h264, 1280x720 | Audio: AAC, 44.1 KHz
    Language: English | Size: 546.39 MB | Duration: 0h 50m

    CapEx-Methodology for capital cost estimation with +/- 20% variation for Brownfield Chemical Projects

    What you'll learn
    Explains simple methodology for estimation of CapEx for Brownfield chemical projects
    How to identify the various cost heads to be covered for Capex
    Importance of site survey and approach to costing for Brownfield chemical projects
    Example of a brownfield project CapEx with steps and templates
    Requirements
    Chemical/Mechanical Engineers with fair knowledge of process plant-Machinery and piping.
    Description
    On many occasions, an EPC company entrusted with the task of submitting a bid for detailed engineering for a brownfield chemical project, would be asked to submit a preliminary capital cost estimate (CapEx) for the proposed project in order to obtain budgetary sanction from the management for implementation.As already stated in my course Engineering cost estimation-Brownfield chemical projects , preparation of CapEx requires certain details and inputs from the customer as also data collected by the EPC company during site survey to assess the scope of the project. Further preliminary drawings like P&ID, Site Layout along with details of scope work are essential for performing this cost estimation.This lecture attempts to define a practical methodology for CapEx estimation with a +/-20% variation in cost for a brownfield project in view of the limited details available for cost estimation and the need to comply with a short timeline specified by customer. Generally this activity will take about 4 to 6 weeks to make the estimate based on site survey report and drawings /data made available.Here, we have assumed that supply of utilities like power, Process water, Cooling water, DM Water, Compressed Air, Instrument Air, Nitrogen, RM and main product storage tanks, vacuum System, Laboratory are under customer scope from existing facilities and only tie-ins for piping , electrical and instrumentation are to be covered in the cost estimation. This project is only an expansion of facility for manufacture by installation of above equipment with minimal investment for civil and structural works. The existing pipe and cable racks shall be extended to cover this new facility . This facility may need a new building to house the above equipment along with new MCC and addition of I/O cards in existing DCS.The first step is creating an individual Excel template to capture the various expenditure to be incurred under all disciplines and populate the details based on above preliminary drawings/documents and site survey reports.

    Overview

    Section 1: Introduction

    Lecture 1 Introduction

    Lecture 2 Capex Methodology

    Lecture 3 Drawings and Documents required

    Section 2: CapEx estimation

    Lecture 4 CapEx estimation Templates

    Lecture 5 Land Development

    Lecture 6 Buildings and Structures

    Lecture 7 Process Plant Machinery

    Lecture 8 Process Plant Equipment List and Cost

    Lecture 9 CapEx-Mechanical and Piping

    Lecture 10 CapEx-Equipment Erection, Piping, Painting and Insulation

    Lecture 11 Capex-Electrical works-Supply and Installation

    Lecture 12 CapEx-Instrumentation-Supply and Installation

    Lecture 13 CapEx-Design, Detailed Engineering and Statutory Approvals

    Lecture 14 CapEx Summary and Conclusion

    Project / Cost estimation engineers in EPC companies executing process plants