Front End Engineering Design of Oil and Gas Projects:
Critical Factors for Project Success: Perspectives, Case Studies, and Lessons
English | 2024 | ISBN: 1032328649 | 145 Pages | PDF (True) | 3 MB
Critical Factors for Project Success: Perspectives, Case Studies, and Lessons
English | 2024 | ISBN: 1032328649 | 145 Pages | PDF (True) | 3 MB
Quite a large number of major oil and gas projects are failures with respect to their costs, schedules, and operational performance. Owner companies and contractors are struggling with the issues causing these failures. The Front End Engineering Design (FEED) has been identified as an important factor that plays a key role in determining the success of a project. However, the FEED and the associated Front End Loading (FEL) do not get the attention they deserve from the players in the business, namely, the owner companies, FEED, and EPC contractors. While academic studies on the FEL and its failures are available, how the seeds of failures are sown during an actual project FEED remains a mystery. The details are usually buried in the rubbished computers and hundreds of files that are shelved in companies' offices.